Hot Search : Source embeded web remote control p2p game More...
Location : Home Search - software engineering projects
Search - software engineering projects - List
本软件围绕工程活动图AOE网的应用这一主题,用图形化的界面实现了AOE网的建立、判断工程可行性、计算工程活动开始时间、确定关键路径和关键活动等功能。 具体功能: 已知假想的工程活动图AOE网,试设计一个算法,要求: (1) 判断工程是否可行 (2) 求出工程中每个活动的最早开始时间e(i),最迟开始时间l(i)和全工程可以完成的最早时间 (3) 确定工程中关键路径和可使整个活动的工期缩短的关键活动 源码在文件夹“源代码清单”中。程序开发时所用的文件在文件夹“配套文件”中提供。另附说明文档。 -This software around the theme of engineering activity diagram AOE network applications, the establishment of the AOE network using a graphical interface to determine the engineering feasibility, calculation of the project activity start time, to determine the critical path and critical activities. Specific features: Figure AOE network known hypothetical engineering activities, try to design an algorithm requirements: (1) to determine whether the project feasible. (2) Find the earliest start time of each activity in the project e (i) the latest start time l (i) the projects will be completed, the earliest time (3) to determine the key activities of the project critical path and make the whole duration of shortening Source in a folder in the source code listing. Files in the folder "supporting documents" used in program development. Attach a separate sheet document.
Date : 2026-01-11 Size : 1.71mb User : lsc
CodeBus is one of the largest source code repositories on the Internet!
Contact us :
1999-2046 CodeBus All Rights Reserved.