Description: Development Environment: ADS. IO mouth test, according to schematic diagram, we can see, DS2-DS5 respectively by the IO port PB19-PB22 control four LED lights, LED lights through the operation, to test the performance of
Platform: |
Size: 155025 |
Author: Jacky |
Hits: