Welcome![Sign In][Sign Up]
Location:
Search - ga for jsp

Search list

[AI-NN-PRDataForJSP

Description: 遗传算法 JSP 用的基本文件,很有价值哦 自己设计的 调试了-GA JSP the basic documents of great value Oh own design debugged
Platform: | Size: 22528 | Author: chenhaonan | Hits:

[WEB CodeJ2EE

Description: 本网站是一个浙江大学求是潮网站的信息聚合网站,即搜集求是潮网站上的信息,在本网站上进行聚合,用户可以通过关键字的设置来搜索相关内容。 1.2 运行环境 本网站采用JSP编写,MyEclipse 8.x Stable (8.0 GA)编译。 操作系统:Windows XP 数据库:Microsoft Access 2007 -This site is a wave of Zhejiang University seeking information on the site aggregator sites, which is seeking to collect information on the tidal sites in the aggregate on the site, the user can set the keyword to search for relevant content. 1.2 Operating Environment This site uses JSP prepared, MyEclipse 8.x Stable (8.0 GA) compilation. Operating System: Windows XP Database: Microsoft Access 2007
Platform: | Size: 901120 | Author: 高能 | Hits:

[AI-NN-PRmatlab-GA-JSP

Description: matlab遗传算法解决车间调度问题,适用于一般问题-matlab genetic algorithm to solve job shop scheduling problem, the problem for general
Platform: | Size: 20480 | Author: lychee | Hits:

[AI-NN-PRjsp-ga

Description: 用遗传算法解决车间调度jsp问题,本人针对现有代码的不足,应该是目前最好的pudn的代码。-Shop scheduling with genetic algorithms to solve the problem jsp, I for existing code deficiencies, should be the best pudn code
Platform: | Size: 5120 | Author: li | Hits:

[ERP-EIP-OA-PortalJSP--E-T--GA

Description: 针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。-This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job.
Platform: | Size: 25600 | Author: 孙启峰 | Hits:

[Internet-NetworkJSPGA1

Description: Job-shop车间调度遗传算法 FT06,6个工件6道工序6台设备 采用基于工序的编码方式(Job-shop genetic algorithm for job shop scheduling FT06,6 pieces, 6 processes, 6 equipment Coding based on process)
Platform: | Size: 1024 | Author: 杨小过 | Hits:

[Documentsjsp-ga-master

Description: proj for job shop schec
Platform: | Size: 479232 | Author: SHUBHAM6169 | Hits:

CodeBus www.codebus.net