Hot Search : Source embeded web remote control p2p game More...
Location : Home Search - scheduling
Search - scheduling - List
在分析以往一些排课软件的基础上,提出一个通用的排课管理信息系统的设计方法,并对一些具体的技术问题作出相应安排-analysis of the past, some of the Course Scheduling software, based on a common course arrangement management information system design methods, as well as some specific technical problems to make the necessary arrangements
Date : 2026-01-09 Size : 4kb User : dale

wimax模型中所有函数,及其实现。源代码。-wimax model all functions, and its realization. Source code.
Date : 2026-01-09 Size : 389kb User : billkim

DL : 0
GLJ调度算法的实现,在MATLAB平台上写的,是源程序-GLJ realize scheduling algorithm, written in MATLAB platform is the source
Date : 2026-01-09 Size : 16kb User : 秦玉

DL : 0
BV调度算法,在MATLAB上的实现,是源程序-BV scheduling algorithm in MATLAB
Date : 2026-01-09 Size : 14kb User : 秦玉

提供多任务的实验功能,能实现多任务的调度-Mission to provide more experimental features, can realize multi-task scheduling
Date : 2026-01-09 Size : 111kb User : eeee

来自印度迈索尔大学的外教的操作系统的课件-Mysore University, India from native operating systems courseware
Date : 2026-01-09 Size : 162kb User : 王闯

某城区有 36 个垃圾集中点,每天都要从垃圾处理厂(第 37 号节点)出发将垃圾运回。现有一种载重 6 吨的运输车。每个垃圾点需要用 10 分钟的时间装车,运输车平均速度为 40 公里/小时(夜里运输,不考虑塞车现象);每台车每日平均工作 4 小时。运输车重载运费 1.8 元 / 吨公里;运输车和装垃圾用的铲车空载费用 0.4 元 / 公里;并且假定街道方向均平行于坐标轴。请你给出满意的运输调度方案以及计算程序。-City have a focal point 36 of refuse every day from the waste disposal plant (node No. 37) returned from the litter. A current load of 6 tons truck. Each collection point needs to load 10 minutes, average speed of vehicles is 40 km/h (night transport, do not consider the phenomenon of traffic congestion) each car an average of four hours a day. Heavy-duty freight vehicles 1.8 yuan/ton-kilometers garbage truck and loaded the truck with no-load cost of 0.4 yuan/km and the assumption that the streets are parallel to the direction of axes. Please give a satisfactory scheduling of transport, as well as computational procedures.
Date : 2026-01-09 Size : 86kb User : 张闽

IEEE论文 A cross-layer scheduling algorithm with QoS support in wireless networks-IEEE paper A cross-layer scheduling algorithm with QoS support in wireless networks
Date : 2026-01-09 Size : 242kb User : 徐海荣

详尽描述了3GPP LTE环境中小区间资源分配仿真的全过程,有蜂窝小区的模拟方法和资源调度的算法,还有性能仿真的曲线图-3GPP LTE detailed description of the allocation of resources between the environment small and medium-sized simulation of the entire process, and the simulation of Cellular and resource scheduling algorithm, as well as the curve of performance simulation
Date : 2026-01-09 Size : 8.82mb User : wqq

SC-FDMA Introduction and Background Implementation in 3GPP LTE Peak Power Characteristics of SC-FDMA Signals Uplink Resource Scheduling in SC-FDMA Systems Summary and Conclusions
Date : 2026-01-09 Size : 697kb User : Araz

A Fair Scheduling for Wireless Mesh Networks.pdf
Date : 2026-01-09 Size : 304kb User : arash

通过动态系统仿真,给出了上述各种MIMO体系下的仿真结果,优秀学位论文 - Under conditions of the Proportional Fair scheduling algorithm, the above-mentioned various MIMO modes are simulated in the proposed dynamic simulation platform. A series of system level metrics are considered in the simulation.
Date : 2026-01-09 Size : 4.69mb User : penny

DL : 0
进程调度是处理机管理的核心内容。本设计要求用C语言编写和调试一个进程调度程序。通过设计本程序可以通过本课程设计可以达成如下目标: 1、深刻理解进程与进程控制块的关系,进程控制块的组成; 2、深刻理解进程的组织方法; 3、掌握调度算法和先来先服务进程调度算法 4、锻炼独立分析问题、解决问题的能力; -Process scheduling is the core processor management. The design using C language and debugging a process scheduler. Through the design of the program can be reached by following the course design goals: 1, deep understanding of the process and the relationship between the process control block, process control block of the composition 2, a profound understanding of the process of organizational methods 3, master scheduling algorithm and a first-come first service process scheduling algorithm 4, exercise independent analysis and solve problems
Date : 2026-01-09 Size : 206kb User : 徐晓柔

时间片轮转调度算法的实现,基于优先级的时间片轮转调度算法调度处理器-Time Flake Cycle Scheduling algorithm, priority-based scheduling algorithm scheduling time slice processor cycle
Date : 2026-01-09 Size : 2kb User : 时恩

Scheduling strategies for LTE uplink with flow
Date : 2026-01-09 Size : 335kb User : noob

协作多点传输技术的相关方面 CoMP Centralized Scheduling for Joint Transmission Coordinated Multi-Point in LTE-Advanced-coordinated multi-point:Centralized Scheduling for Joint Transmission Coordinated Multi-Point in LTE-Advanced
Date : 2026-01-09 Size : 9.57mb User : yang

本文对MBMS的信道映射,网络结构,MAC层调度都有一定的描述,比较全面。-MBMS channel mapping, network structure, the MAC layer scheduling has a certain description is more comprehensive.
Date : 2026-01-09 Size : 879kb User : zhangyanhong

scheduling algorithm for wimax
Date : 2026-01-09 Size : 169kb User : srinivas

Optimal Power Control, Scheduling, and Routing in UWB Networks
Date : 2026-01-09 Size : 418kb User : ippei

为了解决考虑生产总成本的车间调度问题,对引入加工成本、库存管理成本和拖期惩罚成 本的车间调度问题进行了研究,提出了一种改进的遗传算法求解该问题。论述了改进遗传算法的 编码、初始化、选择、交叉和变异操作,通过与基本遗传算法的仿真比较,验证了该算法在收敛速度 和最优解值上的优越性。 -In order to solve the job shop scheduling problem considering the total production cost, the process cost, inventory management cost and delay penalty are introduced. This job shop scheduling problem is studied, and an improved genetic algorithm is proposed to solve this problem. The improved genetic algorithm is discussed. Encoding, initialization, selection, crossover and mutation operation, the convergence speed of the algorithm is verified through simulation comparison with the basic genetic algorithm. And the superiority of the optimal solution.
Date : 2026-01-09 Size : 465kb User : 袁杰
« 12 3 »
CodeBus is one of the largest source code repositories on the Internet!
Contact us :
1999-2046 CodeBus All Rights Reserved.