Hot Search : Source embeded web remote control p2p game More...
Location : Home Search - progress
Search - progress - List
网上书店的一个需求分析,附图,整个文件很完整,希望大家共同进步(转载)-online bookstore a needs analysis, AP, the entire document is complete, we hope that common progress (reproduced)
Date : 2008-10-13 Size : 714.89kb User : lynn

DES资料合集,包括以下内容:对称式金钥系统DESPART-II-04,关于双倍长密钥算法加解密迁移时间进度的要求,DES美国的标准系统941_inform09_g04.doc等 -DES Data Collection, including the following : Symmetric Key System DESPART-II-04, Key length on double encryption algorithm progress of the migration time, DES American standards such as System 941 _inform09_g04.doc
Date : 2008-10-13 Size : 1.33mb User : 舟自横

成功的RF设计必须仔细注意整个设计过程中每个步骤及每个细节,这意味着必须在设计开始阶段就要进行彻底的、仔细的规划,并对每个设计步骤的进展进行全面持续的评估。而这种细致的设计技巧正是国内大多数电子企业文化所欠缺的。-successful RF design must be careful attention to the entire design process every step and every detail, This means that we must begin the design stage will be carried out in a thorough, careful planning, Design steps for each of the comprehensive and sustained progress in the assessment. Such meticulous design skills is the majority of the domestic electronic enterprise culture lack.
Date : 2008-10-13 Size : 29.47kb User : leo

一份完整的项目总结报告,包含项目需求,系统功能设计,系统详细设计,数据库设计,处理流程设计,项目进度,开发费用,项目总结等内容。-a complete project summary report, including project requirements, functional design, detailed system design, database design, the management process design, project progress and development costs, project summary, and other content.
Date : 2008-10-13 Size : 266.91kb User : loafer

软件规格说明(GB8567——88) 包括开发进度月报,模块开发卷宗,软件需求说明书,数据库设计说明书,数据要求说明书, 详细设计说明书,项目开发计划,项目开发总结报告,用户手册等-software specifications (GB8567-- 88), including the development progress monthly, module development files, software requirements specification, design specification database, data requirements specification, the detailed design specification, the project development plan, the final report of project development, user manuals, etc.
Date : 2025-12-19 Size : 173kb User : 李昊

软件开发过程中,经常需要与用户确认某些开发进度和意见,此范例可供参考.-software development process, with users often need to confirm some of the progress and development, this model for reference.
Date : 2025-12-19 Size : 5kb User : blue

网上书店的一个需求分析,附图,整个文件很完整,希望大家共同进步(转载)-online bookstore a needs analysis, AP, the entire document is complete, we hope that common progress (reproduced)
Date : 2025-12-19 Size : 715kb User : lynn

在软件开发领域一个非常流行的人月神话问题:在众多的软件开发项目中,缺乏合理的时间进度是造成项目滞后的最主要原因,它比其他所有因素加起来影响还大,导致这种普遍性灾难的原因是什么呢?相信人月神话会给你一个满意的回答,并提出了优秀的解决方案。-in the area of software development is a popular myth on the issues : the numerous software development projects, the lack of progress in a reasonable time lag resulted in the project is the most important reason that it is more than all other factors combined impact, this universality of the disaster led to what is the reason? The Mythical Man-Month believe will give you a satisfactory answer, and made a good solution.
Date : 2025-12-19 Size : 1.13mb User : fgdfgdfg

好东西,希望大家一起共享,如果你有更好的,希望能提出来,大家共同进步-good things that we share together, if you have a better, I would, we all progress together
Date : 2025-12-19 Size : 1kb User : 陶陶

《软件工程文档模板》 一、可行性研究报告 二、项目开发计划 三、需求规格说明书 四、概要设计说明书 五、详细设计说明书 六、用户操作手册 七、测试计划 八、测试分析报告 九、开发进度月报 十、项目开发总结报告 十一、程序维护手册 十二、软件问题报告 十三、软件修改报告-"software engineering document template" one, two feasibility studies, project development plan three, demand specification four, five brochures outline design, detailed design specification 6, user manuals seven, eight tests, nine test analysis report, the Monthly Report on the progress of the development of 10, project development summary report 11, 12 maintenance manual procedures. report 13 software, software modifications report
Date : 2025-12-19 Size : 104kb User : 东东

单片机汇编语言的机器代码生成效率很高但可读性却并不强,此教程只是我在学习过程中的一些学习笔记和随笔,在这里加以整理和修改,希望和大家一起分享,一起交流,一起学习,一起进步。-SCM machine assembly language code generation with high efficiency but readability was not strong, This tutorial is in the process of learning the study notes and random notes here be edited and revised want to share with everyone, in exchange, learning together and progress together.
Date : 2025-12-19 Size : 386kb User : 林林

软件工程学中涉及到的"开发进度月报" 这份是详细文档格式-software engineering involved in the "Monthly Report on the progress of development" This is a detailed document format
Date : 2025-12-19 Size : 4kb User : apple

二、项目开发计划 1.引言 1 1.1编写目的 1 1.2项目背景 1 1.3定义 2 1.4参考资料 2 2.项目概述 2 2.1工作内容 2 2.2条件与限制 2 2.3产品 2 2.4运行环境 2 2.5服务 3 2.6验收标准 3 3.实施计划 3 3.1任务分解 3 3.2进度 3 3.3预算 3 3.4关键问题 3 4.人员组织及分工 3 5.交付期限 3 6.专题计划要点 3-2, a project development plan. INTRODUCTION 1 1.1 1 1.2 purpose of the preparation of background a project definition 1.3 2 1.4 2 2 references. Project Overview 2 2.1 2 2.2 contents of the work conditions and limitations 2 2.3 2 2.4 products runtime environment 2.5 2 Treasury acceptance standard 3 2.6 3. Implementation task decomposition 3 3.1 3 3.2 3 3.3 progress of the budget 3 3.4 3 4 key issues. Organize and division 5. 3 6 deadline for delivery. Thematic elements of the plan 3
Date : 2025-12-19 Size : 8kb User : wei163

数据挖掘及时间序列分析在NIDS中的应用 现有检测方法及其不足 研究目标 研究意义 研究方案 工作进度-data mining and time series analysis in NIDS of existing methods and the lack of objective research studies Significance program progress
Date : 2025-12-19 Size : 22kb User : kiki9975

DES资料合集,包括以下内容:对称式金钥系统DESPART-II-04,关于双倍长密钥算法加解密迁移时间进度的要求,DES美国的标准系统941_inform09_g04.doc等 -DES Data Collection, including the following : Symmetric Key System DESPART-II-04, Key length on double encryption algorithm progress of the migration time, DES American standards such as System 941 _inform09_g04.doc
Date : 2025-12-19 Size : 1.33mb User :

预算成本管理系统需求框架 1、 做好年度各预算项目的编制、审批、落实、汇总各环节; 2、 对相关单位的年度预算在年内各月的落实情况进行控制;对于需要签订维护合同的跟踪进度, 3、 掌握分析各专业各类预算成本的历年变化情况; 4、 根据年度各预算的相关信息,自动生成相关部门需要的报表; 5、 对于签订的维护合同,跟踪付款情况和对于预算的情况; 6、 根据责权发生原则和合同进度,进行需要计提的项目汇总; 7、 对于跨年合同,提醒需要列入下年预算的项目和金额; -budget management system needs a framework and do a good job of the annual budget project preparation, approval, implementation, Summary of the various components; 2, the relevant units of the annual budget in the year of the implementation of the control; the need for maintenance contracts signed by tracking progress, 3, master professional analysis of the estimated cost of the various changes of the calendar year; 4, according to the annual budget of the relevant information, automatically generating the relevant departments need statements; 5. for the maintenance contracts signed, tracking payments and for the budget; 6. Select happened right under the principles and progress of the contract, provided on the need for the project summary; 7, the year-on-year contracts, reminded of the ne
Date : 2025-12-19 Size : 4kb User : 苯苯

通过VC,实现下载进度时的显示的进度条的百分比-Through the VC, when the download progress to achieve the progress bar shows the percentage of
Date : 2025-12-19 Size : 3.58mb User : xcm

手机操作系统软件设计和演进趋势,可做相关论文引用和知识学习-mobile OS design and progress
Date : 2025-12-19 Size : 628kb User :

介绍如何用labview编写水平进度条,简洁明了,一看就懂-progress bar in labview
Date : 2025-12-19 Size : 5kb User : Hawke

sample Progress Bar Program
Date : 2025-12-19 Size : 51kb User : Fitra Khan
« 12 3 4 5 6 7 8 9 10 »
CodeBus is one of the largest source code repositories on the Internet!
Contact us :
1999-2046 CodeBus All Rights Reserved.