Location:
Search - shuyouguandao
Search list
Description: 问题描述:
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置,即使各油井到主管道之间的输油管道长度总和最小的位置?
编程任务:
给定n 口油井的位置,编程计算各油井到主管道之间的输油管道最小长度总和。-Problem Description: A oil company plans to build a main oil pipeline from east to west. The pipeline must pass through a n wells in oil fields. From each of wells must have an oil pipeline along the Shortest Path (or the South or North) and the director of Road connected. If for a given n the location of wells, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even though the well-to-head Road, the length of the pipeline between the sum of the minimum position? programming tasks: Given the location of wells n, programming calculate their well-to-head Road, the minimum length of the pipeline between the sum of.
Platform: |
Size: 7168 |
Author: 李东 |
Hits:
Description: 输油管道问题
Platform: |
Size: 1024 |
Author: njk |
Hits:
Description: 使用递归算法实现输油管道问题,并设计出管道的解决方案-Use recursion algorithm to realize the oil pipeline, and designed a pipeline solutions
Platform: |
Size: 1024 |
Author: 欧阳 |
Hits:
Description: 输油管道问题,从文件读取站点位置求到所有站点距离最短的管道位置-The pipeline problems from the location of the file to read the site and to all the sites the shortest distance pipeline location
Platform: |
Size: 512000 |
Author: 高洁 |
Hits:
Description: 输油管道问题
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置,即使各油井到主管道之间的输油管道长度总和最小的位置? 编程任务: 给定n 口油井的位置,编程计算各油井到主管道之间的输油管道最小长度总和。-An oil pipeline plans to build a problem from east to west from the main pipeline. The pipeline to pass through a field of n wells. From each of the wells must have a pipeline along the shortest path (or south or north) is connected with the main channel. If a given n the location of wells, that is, their x coordinates (east-west) and y coordinates (north-south), how to determine the optimal location of the main channel, even if the oil pipeline to the main road between the sum of the minimum length position? programming tasks: Given n the location of wells, each well programmed to calculate the main channel between the sum of the minimum length of the pipeline.
Platform: |
Size: 1024 |
Author: 王雪 |
Hits: