Welcome![Sign In][Sign Up]
Location:
Search - deadline

Search list

[Mathimatics-Numerical algorithms算法分析和设计

Description: 经典算法之:连续邮资问题,全排列问题,有限期任务安排,整数划分问题,装载问题-classic algorithms : for the postage issue, all issues with a task deadline, integer division, loading problems
Platform: | Size: 3135 | Author: 常乐 | Hits:

[Other resourcedtt-110

Description: 本人做的一款LED控制程序,具有温度,日期,每天8次定时开关,使用期限设定,密码保护等等。-new LED control procedures, the temperature, date, the 8th day timer switch, the deadline set use, password protection and so on.
Platform: | Size: 101098 | Author: 何代仁 | Hits:

[Other resourceFilterCal

Description: 这个我写的一个计算LC滤波器的程序,可以显示出最后的频率截止情况,有最平法,椭圆法等计算方法-this, I wrote a calculation of the LC filter procedures can demonstrate that the frequency of the final deadline, the most-France, oval law calculation method
Platform: | Size: 145581 | Author: 王力 | Hits:

[Other resource最后期限

Description: 亚马逊网上书店、巴诺书店最佳畅销书《最后期限》 汤姆·迪马可(Tom DeMarco)是大西洋系统行会(www.atlsysguild.com)的负责人之一,同时他也是多塞特家族出版社的三本畅销书(《人件》(将于今年4月在清华大学出版社引进出版),与蒂姆·利斯特合著的《软件艺术的状态》(Software State-of-the-Art),以及《为何软件开销那么大?》(Why Does Software Cost So Much?)和一套基础培训录像(与蒂姆·利斯特合作的《高产团队》)的作者。-Amazon online bookstore, Barno Bookstore, the best-selling novel "final deadline" Mudima soup can (Tom DeMarco) is the Atlantic system will be OK (www.atlsysguild.com), the head of one of his family is Dorset Press three best-selling book ( "people pieces" (to be held in April this year in the introduction of Qinghua University Press published), co-authored with Dimulishite the "state of the art of software" (Software State-of-the-Art), and "why so much software overhead?" (Why Does Software Cost So Much ) and a set of basic training video (Dimulishite cooperation with the "high production team") the authors.
Platform: | Size: 85679 | Author: XQ | Hits:

[Other怎样存钱利最大

Description: 假设银行整存整取存款不同期限的月息利率分别为: 0.63% 期限=1年 0.66% 期限=2年 0.69% 期限=3年 0.75% 期限=5年 0.84% 期限=8年 利息=本金*月息利率*12*存款年限。 现在某人手中有2000元钱,请通过计算选择一种存钱方案,使得钱存入银行20年后得到的利息最多(假定银行对超过存款期限的那一部分时间不付利息)。 *问题分析与算法 为了得到最多的利息,存入银行的钱应在到期时马上取出来,然后立刻将原来的本金和利息加起来再作为新的本金存入银行,这样不断地滚动直到满20年为止,由于存款的利率不同,所以不同的存款方法(年限)存20年得到的利息是不一样的。 -assume that banks Time deposits of various maturities The monthly interest rate : 0.63% one year period = 0.66% = 2 deadline, duration = 0.69% 0.75% 3 year period = 0.84% five-year period = 8 years principal Interest = The monthly rate * * * deposits 12 years. Someone hands now 2,000 yuan, a calculated choice to save the program, making money in the bank after 20 years the maximum interest rates (assuming the right bank deposits over the period of time that part does not pay interest). * Analysis and algorithm to be the most interest, the money deposited in a bank at the end should immediately take up and then immediately to the original principal and interest combined again as a new principal deposited in a bank, so to keep rolling until at least 20 years, due to differences between the i
Platform: | Size: 1600 | Author: 姚紫欣 | Hits:

[Other求具有abcd=(ab+cd)2性质的四位数

Description: 3025这个数具有一种独特的性质:将它平分为二段,即30和25,使之相加后求平方,即(30+25)2,恰好等于3025本身。请求出具有这样性质的全部四位数。 *题目分析与算法设计 具有这种性质的四位数没有分布规律,可以采用穷举法,对所有四位数进行判断,从而筛选出符合这种性质的四位数。具体算法实现,可任取一个四位数,将其截为两部分,前两位为a,后两位为b,然后套用公式计算并判断。 -3025, the figure has a unique character : it divided into noticing, 30 and 25 to make it add up for square, or (30 25) 2, is equal to 3025 itself. Requests of this nature out with the full four-digit. * Subject algorithm design and analysis of this nature is not the four-digit distribution, exhaustive method can be used for all four-digit judgment, thereby screening out with the four-digit of this nature. The specific algorithm can be admitted as a four-digit, its deadline for the two parts, with two of a, b for two after, and then use the formula and judgment.
Platform: | Size: 1062 | Author: 姚紫欣 | Hits:

[Web Servergdhrreply

Description: 东莞人力资源网供求信息系统 新增功能: 1、在原来的基础上增加了后台审核功能,只有通过审核过给予显示。 2、美化了界面及风格,更适合于一般的企业及个人需要。 3、修复很多以前存在的漏洞及死链接。 -Dongguan human resources information system network demand new features : 1, in the original basis of a background audit functions only through the screened given show. 2, beautification of the interface and style, but also suitable for general corporate and personal needs. 3, repair many of the loopholes that existed prior to the deadline link.
Platform: | Size: 269357 | Author: 宝石 | Hits:

[Other resourceC-51

Description: 向您推荐C51BOX 2代仿真器开发工具,适合单片机快速入门和开发,正在限期优惠促销中(点击阅读全文) fangli单片机论坛 http://c51.aycom.cn 公告 -to recommend C51BOX two generation simulator development tools for SCM Quick Start and development, is the deadline preferential marketing (Click to read the full text) fangli SCM Forum http://c51.aycom.cn Notice
Platform: | Size: 17722 | Author: 王俊 | Hits:

[Other resourceFJS

Description: 按作业效益非增序输入作业的截止期限,要求使用上述规则设计出一个算法,使得输出为一个作业可行集j[]。即如果作业i可以在截止期限前执行完毕则将其加入j[]。这样得出的一个结果是最优解,可以获得最大的效益值。-operating efficiency by increasing non-operating input sequence that the deadline for requests to use these rules to design a lgorithm, the output of an operation feasible set j []. That is, if i can work the deadline would be completed before the implementation of its accession j []. This draw is the result of an optimal solution, with the maximum value of the benefits.
Platform: | Size: 8063 | Author: nanaleer | Hits:

[Other resourceucosII-edf

Description: 簡單的3個task的EDF排程,可更替task的deadline-simple task of the three EDF scheduling, the task replacement deadline
Platform: | Size: 117184 | Author: Evan | Hits:

[Other resource292832095

Description: delphi 图书管理系统毕业设计,大家赶快下吧,限期10天哦.GOGOGOsir-graduation library management system design, we quickly under the bar, oh deadline 10 days. GOGOGOsir
Platform: | Size: 128847 | Author: 小程 | Hits:

[Other resourcetask_compositor

Description: 带有期限的作业排序问题:假定只能在一台机器上处理n个作业,每个作业均可在单位时间内完成;又假定每个作业i都有一个截止期限di>0(它是整数),当且仅当作业i在它的期限截止以前被完成时,则获得pi>0的效益。求具有最大效益值的可行解。 文件中包含详细的源代码和注释,以实现这个经典的问题。-period with the operations scheduling problem : the assumption that only a machine n handling operations, each of the operating units can be completed within time; Also assume that each job i have a deadline di
Platform: | Size: 1771 | Author: agang | Hits:

[Other resourceDeadlineScheduling

Description: Deadline Scheduling with Priority for Client-Server Systems .pdf-Deadline Scheduling with Priority for m Memory Stick ent - Server Systems. pdf
Platform: | Size: 140991 | Author: lj | Hits:

[Other resourcexiangmukaifajihua

Description: 二、项目开发计划 1.引言 1 1.1编写目的 1 1.2项目背景 1 1.3定义 2 1.4参考资料 2 2.项目概述 2 2.1工作内容 2 2.2条件与限制 2 2.3产品 2 2.4运行环境 2 2.5服务 3 2.6验收标准 3 3.实施计划 3 3.1任务分解 3 3.2进度 3 3.3预算 3 3.4关键问题 3 4.人员组织及分工 3 5.交付期限 3 6.专题计划要点 3-2, a project development plan. INTRODUCTION 1 1.1 1 1.2 purpose of the preparation of background a project definition 1.3 2 1.4 2 2 references. Project Overview 2 2.1 2 2.2 contents of the work conditions and limitations 2 2.3 2 2.4 products runtime environment 2.5 2 Treasury acceptance standard 3 2.6 3. Implementation task decomposition 3 3.1 3 3.2 3 3.3 progress of the budget 3 3.4 3 4 key issues. Organize and division 5. 3 6 deadline for delivery. Thematic elements of the plan 3
Platform: | Size: 8275 | Author: wei163 | Hits:

[Software EngineeringDeadlineScheduling

Description: Deadline Scheduling with Priority for Client-Server Systems .pdf-Deadline Scheduling with Priority for m Memory Stick ent- Server Systems. pdf
Platform: | Size: 140288 | Author: lj | Hits:

[Software Engineeringthe_deadline

Description: 最后限期,外国软件工程的经典之作,讲述软件开发的项目管理-The deadline, foreign software engineering classic, about the software development project management
Platform: | Size: 69632 | Author: InfoTech | Hits:

[Mathimatics-Numerical algorithms7

Description: 1. 最早截止时间优先EDF(Earliest DeadlineFirst)算法是非常著名的实时调度算法之一。在每一个新的就绪状态,调度器都是从那些已就绪但还没有完全处理完毕的任务中选择最早截止时间的任务,并将执行该任务所需的资源分配给它。在有新任务到来时,调度器必须立即计算EDF,排出新的定序,即正在运行的任务被剥夺,并且按照新任务的截止时间决定是否调度该新任务。如果新任务的最后期限早于被中断的当前任务,就立即处理新任务。按照EDF算法,被中断任务的处理将在稍后继续进行。 -1. The first priority deadline for EDF (Earliest DeadlineFirst) algorithm is a very famous one in real-time scheduling algorithm. In every state of readiness for a new, scheduler from those already in place but has not fully dealt with the mandate to select the earliest deadline for the task, and the implementation of the tasks required for the allocation of resources to it. In the arrival of new tasks, the scheduler must immediately calculate EDF, from the new sequencing, that is the task of running was curtailed, and new tasks in accordance with the deadline for deciding whether to dispatch the new tasks. If the new mission as early as the deadline for the immediate task was interrupted immediately to deal with new tasks. In accordance with the EDF algorithm, the task was interrupted to deal with will be at a later date to continue.
Platform: | Size: 2048 | Author: wjx | Hits:

[Algorithmworks-with-deadline

Description: 带期限的作业,算法课上写,先对其作业按照其效益进行排序,然后再进行截止时间选择。-works with deadline.
Platform: | Size: 832512 | Author: ytt | Hits:

[Linux-Unixdeadline-iosched

Description: Deadline i/o scheduler driver for Linux..
Platform: | Size: 3072 | Author: pushup | Hits:

[Linux-Unixdeadline

Description: Deadline Scheduling Class (SCHED DEADLINE) for Linux v2.13.6.
Platform: | Size: 13312 | Author: zaoginws | Hits:
« 12 3 4 5 6 »

CodeBus www.codebus.net